Projects
Eight engagements. RM 12.7 million delivered or running.
Every system below is either in production now or was handed over to the agency’s own team. Values are contract values. Where we worked beside another vendor, it says so.
iPayment at JANM
— RM 8.2 million, in production
Select any engagement for scope, delivery, and interface detail
8 engagements · RM 12.7 million
iPayment RM 8.2 million 2025 – ongoing
- RM 8.2m
- 3
- RHEL
- In production
What the system does
The national payment platform of the Accountant General’s Department. Payment instructions are raised, authorised, and settled through it, and reconciled against the daily settlement file.
Read the full case study →What we delivered
- Maintenance and support of the production platform.
- Red Hat Enterprise Linux administration with high-availability load balancing.
- Proactive monitoring with a defined escalation path.
- Defect resolution against an agreed response window.
- Technical and operational documentation kept current as the system changes.
Interfaces to systems we do not own
Payment instruction out, settlement acknowledgement back.
Retries carry an idempotency key. Unacknowledged instructions are held and reconciled against the daily settlement file, never resubmitted blind.
Payment voucher out, payment status back.
Requests are queued on timeout and replayed in order. Status mismatches are raised in the daily reconciliation report for a named officer to clear.
Signed remittance message set.
Rejected messages are parked for manual release. A financial instruction is never resubmitted automatically.
Portal Pengurusan Sumber Manusia RM 2.3 million 2023 – 2026
- RM 2.3m
- 18
- SAP HANA
- In production
What the system does
Eighteen human resource modules covering the full employee lifecycle for the Construction Industry Development Board, from appointment through leave, claims, and performance.
Read the full case study →What we delivered
- Requirements analysis with the agency’s own HR officers.
- Eighteen modules built, tested, and accepted.
- Read integration against the agency’s SAP HANA instance.
- Mobile approval path for leave and claims.
- User acceptance testing run with the client, module by module.
- Delivered beside other vendors’ teams working in the same project.
Interfaces to systems we do not own
Employee master, cost centre, organisation structure.
The last successful snapshot is served with its timestamp visible to the user. The delta job re-runs on the next cycle without operator action.
Leave and claim approval request.
Approval state lives in the portal. The notification carries no decision, so a lost message cannot approve or reject anything.
Crop Cutting Survey and dashboard RM 500,000 2024 – 2025
- RM 500k
- 2
- Offline
- Delivered
What the system does
Padi yield enumeration captured in the field, and a dashboard for the officers who act on the numbers. Enumerators work in areas without reliable coverage.
What we delivered
- Field capture application for enumerators.
- Signed offline session so field work continues without coverage.
- Sync with re-authentication on return to coverage.
- Officer dashboard over the collected survey data.
Interfaces to systems we do not own
User principal name, enumerator role.
Enumerator devices hold a signed offline session so field work continues without coverage, and sync re-authenticates on return.
Survey assignment, sync prompt.
Notifications are advisory. Every assignment also arrives on the next authenticated sync, so a dropped push loses no work.
Easy Coop 2.0 — Sistem Perakaunan Konsep Mudah Koperasi RM 390,000 Sept 2026 – Sept 2028
- RM 390k
- Dev partner
- 24 months
- Awarded
What the system does
A simplified accounting system for cooperatives registered with the Malaysia Co-operative Societies Commission.
What we delivered
- Development against the scope set by the appointed contractor.
- Accounting module build and test.
- Documentation to the Commission’s format.
- Examedia Software is the development partner to the appointed contractor on this engagement.
Interfaces
Interfaces are defined by the appointed contractor. None are contracted to Examedia Software at award.
FOAMMS 3.0 RM 380,000 2022 – 2024
- RM 380k
- Complaint to payment
- 1
- Delivered
What the system does
Facility complaints for Putrajaya, tracked from lodgement through work order to contractor payment — one record carrying the whole chain.
Read the full case study →What we delivered
- Complaint lodgement and triage.
- Work order issue and contractor assignment.
- Payment certification against completed work.
- Mobile notification for assignment and status change.
Interfaces to systems we do not own
Complaint assignment, work order status change.
The complaint queue remains the record of truth. A missed push changes no state and the queue is re-read on open.
SIMS RM 710,000 2021 – 2023
- RM 710k
- Stock and inventory
- 1
- Delivered
What the system does
Stock and inventory control across Kuala Lumpur City Hall stores, with a mobile approval path for stock movement between them.
Read the full case study →What we delivered
- Stock master and store-level inventory control.
- Movement request and approval workflow.
- Mobile approval for authorised officers.
- Stock position reporting.
Interfaces to systems we do not own
Stock movement approval request.
Approvals are actioned in the system, not in the notification. Pending items stay in the approver’s list until cleared.
GMACA RM 150,000 2021 – 2023
- RM 150k
- 12
- 1
- Delivered
What the system does
Training management for the MACC Academy across twelve modules — course catalogue, enrolment, attendance, and completion records.
What we delivered
- Twelve training management modules.
- Single sign-on against the Academy’s own directory.
- Attendance and completion records per officer.
Interfaces to systems we do not own
User principal name, group membership.
Local credential fallback for named administrators only. Session length is unchanged, so a directory outage cannot extend access.
Iltizam Catalyst · PDP Graduate · PDP Alumni RM 110,000 2022 – 2024
- RM 110k
- 3
- Programme management
- Delivered
What the system does
Three programme management systems for the investment company’s development and alumni tracks — application, selection, cohort tracking, and alumni records.
What we delivered
- Iltizam Catalyst programme management.
- PDP Graduate intake and cohort tracking.
- PDP Alumni records and engagement history.
Interfaces
Standalone programme systems. No interfaces to systems outside Ekuiti Nasional Berhad.
Want the interface detail?
The home page carries the live integration map — every interface with its protocol, direction, payload, and what happens when it fails.